RENAULT KADJAR 1.2 TCe Intens/Park snr/Ecc/Carplay/NAP/NL

Year 2016
Mileage 168.048 NAP checked
Fueltype Benzine
Cilinder volume 1197 cc
Power 96 kW / 131 PK
Transmission Handgeschakeld
Bodytype SUV / terreinwagen
Euro class Unknown
Curb mass Unknown
VAT/Margin Marge
Rest bpm € 939,-

To place a bid you have to register

FREE REGISTRATION!

Or login

Options and accessories i

No rights can be derived from the description of options and accessories below. The options shown are based on an external data source. It is important that you conduct thorough research on the type, model, and associated options yourself. Do not forget to carefully examine the photos as well. Should you have any questions or doubts, please feel free to contact us. We are ready to assist you with your inquiries.

"Lichtmetalen velgen 17""", Airbag(s) hoofd achter, Airbag(s) hoofd voor, Airbag(s) side voor, Airbag bestuurder, Airbag passagier, Airco automatisch, Anti Blokkeer Systeem, Anti Blokkeer Systeem (ABS), Anti Slip Control, Armsteun achter, Armsteun voor, Audioinstallatie met CD-speler, Autotelefoonvoorbereiding met Bluetooth, Bandenspanningscontrolesysteem, Buitenspiegel(s) automatisch dimmend, Buitenspiegels elektrisch inklapbaar, Buitenspiegels elektrisch verstelbaar, Buitenspiegels verwarmbaar, Cruise control, DAB-ontvanger, Dakrails, Dimlichten automatisch, Electronic Stability Program, Electronic Stability Program (ESP), Elektrische ramen voor, Extra getint glas, Grootlicht-assistent, Halogeen mistlampen, Hill hold-functie, Keyless entry, LED achterlichten, LED dagrijverlichting, Lederen versnellingspook, Lendesteunen (verstelbaar), Multimedia-voorbereiding, Navigatie-systeem full map, Parkeersensor achter, Parkeersensor voor, Passagiersstoel in hoogte verstelbaar, Regensensor, Rijstrooksensor, Spraakbediening, Startblokkering, Stuurwiel multifunctioneel, Tractie Controle Systeem (TCS), Verkeersbord detectie, Verwarmde voorruit


General

Registration JT865K
VIN number VF1RFE00255******
Make Renault
Model Kadjar
Driving V

History

Mileage 168048
Year 2016
Date first admission (Netherlands) 17-06-2016
Import Nee

Financial

BPM € 4.992,-
Rest BPM € 939,-
Rest bpm refund possible Ja

Body

Color rood
Number of doors 5
Number of seats 5

Engine and performance

Number of cilinders 4
Cilinder volume 1197 cm2
Power (kW) 96
Power (pk) 130.56
LPG G3 false

Rating


Download app