PEUGEOT 3008 1.2 PureTech GT Line 2016 ZWART DODEHOEK&RIJSTR

Year 2016
Mileage 151.829 NAP checked
Fueltype Benzine
Cilinder volume 1199 cc
Power 96 kW / 131 PK
Transmission Handgeschakeld
Bodytype SUV / terreinwagen
Euro class Unknown
Curb mass Unknown
VAT/Margin Marge
Rest bpm € 717,-

To place a bid you have to register

FREE REGISTRATION!

Or login

Options and accessories i

No rights can be derived from the description of options and accessories below. The options shown are based on an external data source. It is important that you conduct thorough research on the type, model, and associated options yourself. Do not forget to carefully examine the photos as well. Should you have any questions or doubts, please feel free to contact us. We are ready to assist you with your inquiries.

"Lichtmetalen velgen 19""", Accident Avoidance System, Achterbank in delen neerklapbaar, Achteruitrijcamera, Airbag(s) hoofd achter, Airbag(s) hoofd voor, Airbag(s) side voor, Airbag bestuurder, Airbag passagier, Alarmsysteem, Anti Blokkeer Systeem (ABS), Armsteun voor, Autotelefoonvoorbereiding met Bluetooth, Bandenspanningscontrolesysteem, Bestuurdersstoel in hoogte verstelbaar, Binnenspiegel automatisch dimmend, Brake Assist System, Buitenspiegels elektrisch inklapbaar, Buitenspiegels elektrisch verstelbaar, Buitenspiegels verwarmbaar, Centrale deurvergrendeling met afstandsbediening, Chroom delen exterieur, Connected services, Cruise control, DAB-ontvanger, Dimlichten automatisch, Dodehoek detector, Electronic Brake Distribution (EBD), Electronic Stability Program (ESP), Electronic climate controle, Elektrisch bedienbare achterklep met sensorsturing, Elektrische ramen voor, Extra getint glas, Grootlicht-assistent, Hill hold-functie, Keyless entry, LED dagrijverlichting, LED koplampen, LED mistlampen, Lederen/stoffen bekleding, Lederen stuurwiel, Lendesteunen (verstelbaar), Metallic lak, Multimedia-voorbereiding, Navigatiesysteem, Pack City, Pack Navigatie, Pack Premium, Parkeer-assistent, Parkeersensor achter, Parkeersensor voor, Passagiersstoel in hoogte verstelbaar, Radio, Regensensor, Rijstrooksensor met correctie, Rondomzicht camera, Spraakbediening, Startblokkering, Stuurwiel multifunctioneel, Telefoonintegratie premium, Tractie Controle Systeem (TCS), Verkeersbord detectie, Vermoeidheids herkenning


General

Registration KN737Z
VIN number VF3MRHNYHGS******
Make Peugeot
Model 3008
Driving V

History

Mileage 151829
Year 2016
Date first admission (Netherlands) 27-10-2016
Import Nee

Financial

BPM € 3.628,-
Rest BPM € 717,-
Rest bpm refund possible Ja

Body

Color zwart
Number of doors 5
Number of seats 5

Engine and performance

Number of cilinders 3
Cilinder volume 1199 cm2
Power (kW) 96
Power (pk) 130.56
LPG G3 false

Rating


Download app