PEUGEOT 208 1.2 PureTech Signature | NAP | Automaat | Cruise | Navi | Lage KM's!

Year 2018
Mileage 27.305 NAP checked
Fueltype Benzine
Cilinder volume 1199 cc
Power 81 kW / 110 PK
Transmission Automaat
Bodytype Hatchback
Euro class Unknown
Curb mass Unknown
VAT/Margin Marge
Rest bpm € 1.067,-

To place a bid you have to register

FREE REGISTRATION!

Or login

Options and accessories i

No rights can be derived from the description of options and accessories below. The options shown are based on an external data source. It is important that you conduct thorough research on the type, model, and associated options yourself. Do not forget to carefully examine the photos as well. Should you have any questions or doubts, please feel free to contact us. We are ready to assist you with your inquiries.

Achterbank in delen neerklapbaar, Achteropkomend verkeer waarschuwing, Airbag(s) hoofd achter, Airbag(s) hoofd voor, Airbag(s) side voor, Airbag bestuurder, Airbag passagier, Airco, Anti Blokkeer Systeem (ABS), Armsteun voor, Autotelefoonvoorbereiding met Bluetooth, Bandenspanningscontrolesysteem, Bestuurdersstoel in hoogte verstelbaar, Binnenspiegel automatisch dimmend, Boordcomputer, Brake Assist System, Buitenspiegels elektrisch inklapbaar, Buitenspiegels elektrisch verstelbaar, Buitenspiegels in carrosseriekleur, Buitenspiegels verwarmbaar, Centrale deurvergrendeling met afstandsbediening, Cruise control, Dimlichten automatisch, Electronic Brake Distribution (EBD), Electronic Stability Program (ESP), Elektrische ramen voor, Hill hold-functie, LED achterlichten, LED dagrijverlichting, Lederen stuurwiel, Lederen versnellingspook, Mistlampen voor, Multimedia-voorbereiding, Parkeersensor achter, Radio, Regensensor, Start/stop systeem, Startblokkering, Stuurbekrachtiging, Stuur verstelbaar, Stuurwiel multifunctioneel, Telefoonintegratie premium, Tenaamstelling & Vrijwaring


General

Registration XG741G
VIN number VF3CCHNPNJT******
Make Peugeot
Model 208
Driving V

History

Mileage 27305
Year 2018
Date first admission (Netherlands) 28-12-2018
Import Nee
Date APK 28-12-2026

Financial

BPM € 4.023,-
Rest BPM € 1.067,-
Rest bpm refund possible Ja

Body

Color grijs
Number of doors 5
Number of seats 5

Engine and performance

Number of cilinders 3
Cilinder volume 1199 cm2
Power (kW) 81
Power (pk) 110.16
LPG G3 false

Rating


Download app