FORD PUMA 1.0 EcoBoost Hybrid ST-Line X I NEW MODEL I 360 CAM I 4JR Garantie I DRIVER-PACK I WINTER-PACK I KEY-LESS I BLIS I B&O I

Year 2024
Mileage 5.255
Fueltype Hybride Benzine
Cilinder volume 999 cc
Power 98 kW / 133 PK
Transmission Handgeschakeld
Bodytype SUV / terreinwagen
Euro class Unknown
Curb mass Unknown
VAT/Margin BTW
Rest bpm No

To place a bid you have to register

FREE REGISTRATION!

Or login

Options and accessories i

No rights can be derived from the description of options and accessories below. The options shown are based on an external data source. It is important that you conduct thorough research on the type, model, and associated options yourself. Do not forget to carefully examine the photos as well. Should you have any questions or doubts, please feel free to contact us. We are ready to assist you with your inquiries.

"Lichtmetalen velgen 17""", Achterbank in delen neerklapbaar, Achteruitrijcamera, Adaptive Cruisecontrol, Airbag, Airbag(s) side, Airbag(s) side voor, Airbag bestuurder, Airbag passagier, Airco, Airco automatisch, Alcantara bekleding, Anti Blokkeer Systeem (ABS), Armsteun achter, Armsteun voor, Audio-navigatie, Audio-navigatie full map, Autotelefoonvoorbereiding, Autotelefoonvoorbereiding met Bluetooth, B&O, Binnenspiegel automatisch dimmend, Boordcomputer, Buitenspiegels elektrisch inklapbaar, Buitenspiegels elektrisch verstelbaar, Buitenspiegels in carrosseriekleur, Buitenspiegels verwarmbaar, Bumpers in carrosseriekleur, Centrale deurvergrendeling, Centrale deurvergrendeling met afstandsbediening, Cruise control, Dakrails, Dodehoekherkenning, Dubbele airbag, Electronic Brake Distribution (EBD), Electronic Stability Program (ESP), Elektrische ramen, Elektronische climate control, Extra getint glas, Hoofdsteunen achter, Hoofdsteunen voor, Keyless Entry, Lederen bekleding, Lederen stuurwiel, Lichtmetalen velgen, Metallic lak, Mistlampen, Mistlampen voor, Multimedia-voorbereiding, Navigatiesysteem, Parkeersensor achter, Parkeersensor voor, QI Set (Draadloos laden), Regensensor, Sportstoelen, Startblokkering, Stuurbekrachtiging, Stuur verwarming, Stuurwiel multifunctioneel, Toerenteller, Tractie Controle Systeem (TCS), USB, Verstelbare (in hoogte) bestuurders stoel, Verstelbare stuurkolom, Verwarmde voorstoelen, stoelverwarming


General

Registration JLR19P
VIN number WF02XXERK2R******
Make Ford
Model Puma
Driving V

History

Mileage 5255
Year 2024
Import Ja
Date APK 09-10-2028

Financial

BPM € 3.930,-

Body

Color rood
Number of doors 4
Number of seats 5

Engine and performance

Number of cilinders 3
Cilinder volume 999 cm2
Power (kW) 98
Power (pk) 133.28
LPG G3 false

Rating


Download app